Revision of last term's work

  • Revision of work done in the previous term
  • (i) Definition of Foundation
    (ii) Functions of Foundation – support and weight of walls, roofs and inhabitants
    (ii) Types of Foundation – strip, stepped, raft etc.
    (iii) Types and Properties of Soil
    (iv) Hand Tools and Plant for Excavation: diggers, shovels, excavator, etc.
  • (i) Materials for Making Walls – grass, zinc, curtain, bricks, etc.
    (ii) Types of Walls – walls grass, zinc, curtain bricks, etc.
    (iii) Materials for Bonding
  • (i) Floor – basement, ground floor, first floor, etc.
    (ii) DPC
  • (i) Doors – flush door, glazed, sliding, revolving, etc.
  • (ii) Windows – louver, sliding, casement, etc
  • (iii) Lintel
  • (i) Types of Roof – flat roof, double pitched, lean-to Gable, etc.
    (ii) Roofing Materials – grass, zinc, aluminium, etc.

BUILDING:
Simple Blueprint Reading

  • (i) Sanitary Wares – sink, bath, showers, etc. soak-away, septic tank, socket, windows, doors, room, etc.

  • Revision of work done in Second Term

Back to: Basic Technology – JSS3 (Upper Basic 9) > Second Term